YAFT.LIVE

AIC132

LHR → BLR · Boeing 787-8 · Air India

For travellers

Departure · London (LHR)

Terminal 2
Scheduled 28 Sep 22:10
Board status: Departed 22:12
Airborne since 28 Sep 21:57 (ADS-B)

Arrival · Bangalore (BLR)

Terminal 2 · Gate C2 · Baggage belt 3B,3A
Scheduled 29 Sep 12:50 · Estimated 29 Sep 12:50
Board status: Arrived
Landed 29 Sep 09:29 (estimated)

Board data from blr, heathrow, updated 2605 min ago; times local to each airport.

Flight

Status
Incomplete (signal lost)
Departure
London Heathrow Airport (LHR) — London, United Kingdom
Scheduled departure
2026-09-28 21:10 UTC
Departed
2026-09-28 20:57 UTC
Arrival
Kempegowda International Airport (BLR) — Bangalore, India (scheduled)
Scheduled arrival
2026-09-29 07:20 UTC
Estimated arrival
2026-09-29 07:20 UTC
Also flies as
Distance flown
6484 km
Straight-line distance
8047 km

Aircraft

Registration
Type
Boeing 787-8
Seats
256 total (238 Economy, 18 Business)

Altitude & speed

Max altitude
41,000 ft
Max ground speed
543 kt
Tracked
7h 6m · 6,478 km
Altitude (ft, max 41,000)
022,14044,2800m1h 0m2h 0m3h 0m4h 0m5h 0m6h 0m7h 0m
Ground speed (kt, max 543)
02935860m1h 0m2h 0m3h 0m4h 0m5h 0m6h 0m7h 0m
Altitude (ft, max 41,000)
022,14044,2800m2h 0m4h 0m6h 0m
Ground speed (kt, max 543)
02935860m2h 0m4h 0m6h 0m

From the ADS-B positions we received; time since the first fix. A dashed stretch is a gap in reception, bridged by a straight line.

Route map

Airlines

Air India (AIC)
Air Inuit (AIE)

Latest flights

DepartedFlightRouteRegAircraftStatusDistance
2026-10-01 05:35 UTC AIC132 LHR → BLR
London → Bangalore
VT-ANO Boeing 787-8 Completed 1280 km
2026-09-30 21:31 UTC AIC132 LHR → BLR
London → Bangalore
VT-ANO Boeing 787-8 Incomplete (signal lost) ~8533 km est. (6307 km recorded)
2026-09-30 06:11 UTC AIC132 LHR → BLR
London → Bangalore
VT-ANX Boeing 787-8 Completed 605 km
2026-09-29 21:08 UTC AIC132 LHR → BLR
London → Bangalore
VT-ANX Boeing 787-8 Incomplete (signal lost) 7798 km
2026-09-29 05:23 UTC AIC132 LHR → BLR
London → Bangalore
VT-ANV Boeing 787-8 Completed 997 km
2026-09-28 20:57 UTC AIC132 LHR → BLR
London → Bangalore
VT-ANV Boeing 787-8 Incomplete (signal lost) ~8706 km est. (6484 km recorded)
2026-09-28 05:17 UTC AIC132 LHR → BLR
London → Bangalore
VT-ANG Boeing 787-8 Completed 1208 km
2026-09-27 20:59 UTC AIC132 LHR → BLR
London → Bangalore
VT-ANG Boeing 787-8 Incomplete (signal lost) ~8975 km est. (6739 km recorded)
2026-09-27 05:33 UTC AIC132 LHR → BLR
London → Bangalore
VT-ANX Boeing 787-8 Completed 962 km
2026-09-26 21:01 UTC AIC132 LHR → BLR
London → Bangalore
VT-ANX Boeing 787-8 Incomplete (signal lost) ~8728 km est. (6499 km recorded)
2026-09-26 06:12 UTC AIC132 LHR → BLR
London → Bangalore
VT-ANL Boeing 787-8 Completed 547 km
2026-09-25 21:21 UTC AIC132 LHR → BLR
London → Bangalore
VT-ANL Boeing 787-8 Incomplete (signal lost) 7800 km
2026-09-25 06:21 UTC AIC132 LHR → BLR
London → Bangalore
VT-ANG Boeing 787-8 Completed 520 km
2026-09-24 21:34 UTC AIC132 LHR → BLR
London → Bangalore
VT-ANG Boeing 787-8 Incomplete (signal lost) 7861 km
2026-09-24 05:19 UTC AIC132 LHR → BLR
London → Bangalore
VT-ANX Boeing 787-8 Completed 1173 km
2026-09-23 21:08 UTC AIC132 LHR → BLR
London → Bangalore
VT-ANX Boeing 787-8 Incomplete (signal lost) ~8516 km est. (6291 km recorded)
2026-09-23 06:09 UTC AIC132 LHR → BLR
London → Bangalore
VT-ANK Boeing 787-8 Completed 805 km
2026-09-22 21:34 UTC AIC132 LHR → BLR
London → Bangalore
VT-ANK Boeing 787-8 Incomplete (signal lost) ~8721 km est. (6482 km recorded)
2026-09-21 21:34 UTC AIC132 LHR → BLR
London → Bangalore
VT-ANG Boeing 787-8 Completed 8585 km
2026-09-20 21:13 UTC AIC132 LHR → BLR
London → Bangalore
VT-ANX Boeing 787-8 Completed 8518 km
2026-09-19 21:11 UTC AIC132 LHR → BLR
London → Bangalore
VT-ANN Boeing 787-8 Completed 8766 km
2026-09-18 21:19 UTC AIC132 LHR → BLR
London → Bangalore
VT-ANV Boeing 787-8 Completed 8744 km
2026-09-17 21:47 UTC AIC132 LHR → BLR
London → Bangalore
VT-AND Boeing 787-8 Completed 8905 km
2026-09-16 21:54 UTC AIC132 LHR → BLR
London → Bangalore
VT-ANE Boeing 787-8 Completed 9016 km
2026-09-15 21:22 UTC AIC132 LHR → BLR
London → Bangalore
VT-ANG Boeing 787-8 Completed 9219 km
2026-09-14 21:10 UTC AIC132 LHR → BLR
London → Bangalore
VT-ANK Boeing 787-8 Completed 9062 km
2026-09-13 21:19 UTC AIC132 LHR → BLR
London → Bangalore
VT-ANH Boeing 787-8 Completed 8963 km
2026-09-12 21:29 UTC AIC132 LHR → BLR
London → Bangalore
VT-ANG Boeing 787-8 Completed 9005 km
2026-09-11 21:42 UTC AIC132 LHR → BLR
London → Bangalore
VT-ANG Boeing 787-8 Completed 9145 km
2026-09-10 21:42 UTC AIC132 LHR → BLR
London → Bangalore
VT-TSH Boeing 787-9 Completed 9182 km
2026-09-09 22:31 UTC AIC132 LHR → BLR
London → Bangalore
VT-ANL Boeing 787-8 Completed 9025 km
2026-09-07 21:13 UTC AIC132 LHR → BLR
London → Bangalore
VT-ANV Boeing 787-8 Completed 9121 km
2026-09-06 22:10 UTC AIC132 LHR → BLR
London → Bangalore
VT-ANK Boeing 787-8 Completed 9177 km
2026-09-05 21:55 UTC AIC132 LHR → BLR
London → Bangalore
VT-AND Boeing 787-8 Completed 9058 km
2026-09-04 21:47 UTC AIC132 LHR → BLR
London → Bangalore
VT-AND Boeing 787-8 Completed 8912 km
2026-09-03 21:09 UTC AIC132 LHR → BLR
London → Bangalore
VT-ANM Boeing 787-8 Completed 9142 km
2026-09-02 21:43 UTC AIC132 LHR → BLR
London → Bangalore
VT-ANG Boeing 787-8 Completed (landing presumed) 9023 km
2026-09-01 22:00 UTC AIC132 LHR → BLR
London → Bangalore
VT-ANV Boeing 787-8 Completed 8995 km
2026-08-31 21:38 UTC AIC132 LHR → BLR
London → Bangalore
VT-ANV Boeing 787-8 Completed 9072 km
2026-08-30 21:59 UTC AIC132 LHR → BLR
London → Bangalore
VT-ANH Boeing 787-8 Completed 9029 km
2026-08-29 21:43 UTC AIC132 LHR → BLR
London → Bangalore
VT-ANK Boeing 787-8 Completed 9024 km
2026-08-28 22:13 UTC AIC132 LHR → BLR
London → Bangalore
VT-ANH Boeing 787-8 Completed 9195 km
2026-08-27 22:09 UTC AIC132 LHR → BLR
London → Bangalore
VT-ANK Boeing 787-8 Completed 8871 km
2026-08-26 21:26 UTC AIC132 LHR → BLR
London → Bangalore
VT-NAA Boeing 787-8 Completed 9028 km
2026-08-25 21:38 UTC AIC132 LHR → BLR
London → Bangalore
VT-ANL Boeing 787-8 Completed 8973 km
2026-08-24 22:28 UTC AIC132 LHR → BLR
London → Bangalore
VT-ANA Boeing 787-8 Completed 9105 km
2026-08-23 21:20 UTC AIC132 LHR → BLR
London → Bangalore
VT-ANX Boeing 787-8 Completed 9109 km
2026-08-22 22:14 UTC AIC132 LHR → BLR
London → Bangalore
VT-ANA Boeing 787-8 Completed 10887 km
2026-08-21 21:47 UTC AIC132 LHR → BLR
London → Bangalore
VT-ANG Boeing 787-8 Completed 10749 km
2026-08-20 21:36 UTC AIC132 LHR → BLR
London → Bangalore
VT-ANS Boeing 787-8 Completed 10068 km

← Back to the live map