YAFT.LIVE

UGD431

BOM → NUU · AIRBUS A-330-800 · Uganda Airlines

Flight

Status
Completed
Arrival confirmed via
ADS-B (callsign change)
Departure
Chhatrapati Shivaji International Airport (BOM) — Mumbai, India
Departed
2026-09-19 19:25 UTC
Arrival
Nakuru Airport (NUU) — Nakuru, Kenya
Distance flown
4602 km
Straight-line distance
4548 km

Aircraft

Registration
Type
AIRBUS A-330-800
Seats
261 total (20 Business, 28 Premium Economy, 213 Economy)

Altitude & speed

Max altitude
40,000 ft
Max ground speed
483 kt
Tracked
5h 23m · 4,584 km
Altitude (ft, max 40,000)
021,60043,2000m1h 0m2h 0m3h 0m4h 0m5h 0m
Ground speed (kt, max 483)
02615220m1h 0m2h 0m3h 0m4h 0m5h 0m
Altitude (ft, max 40,000)
021,60043,2000m2h 0m4h 0m
Ground speed (kt, max 483)
02615220m2h 0m4h 0m

From the ADS-B positions we received; time since the first fix. A dashed stretch is a gap in reception, bridged by a straight line.

Route map

Airline

Uganda Airlines (UGD)

Latest flights

DepartedFlightRouteRegAircraftStatusDistance
2026-10-03 19:53 UTC UGD431 BOM → NUU
Mumbai → Nakuru
5X-NIL AIRBUS A-330-800 In progress ~4548 km est.
2026-10-01 02:49 UTC UGD431 BOM → NUU
Mumbai → Nakuru
5X-NIL AIRBUS A-330-800 Incomplete (signal lost) 4587 km
2026-09-24 03:03 UTC UGD431 BOM → NUU
Mumbai → Nakuru
5X-NIL AIRBUS A-330-800 Incomplete (signal lost) 4568 km
2026-09-19 19:25 UTC UGD431 BOM → NUU
Mumbai → Nakuru
5X-NIL AIRBUS A-330-800 Completed 4602 km
2026-09-17 03:09 UTC UGD431 BOM → NUU
Mumbai → Nakuru
5X-NIL AIRBUS A-330-800 Incomplete (signal lost) 4568 km
2026-09-12 19:52 UTC UGD431 BOM → NUU
Mumbai → Nakuru
5X-NIL AIRBUS A-330-800 Completed 4566 km
2026-09-10 03:02 UTC UGD431 BOM → ?
Mumbai → ?
5X-NIL AIRBUS A-330-800 Incomplete (signal lost) 4589 km
2026-09-05 20:03 UTC UGD431 BOM → ?
Mumbai → ?
5X-NIL AIRBUS A-330-800 Incomplete (signal lost) 488 km
2026-09-03 03:09 UTC UGD431 BOM → NUU
Mumbai → Nakuru
5X-NIL AIRBUS A-330-800 Incomplete (signal lost) 4666 km
2026-08-29 19:57 UTC UGD431 BOM → NUU
Mumbai → Nakuru
5X-NIL AIRBUS A-330-800 Completed 4728 km
2026-08-27 03:40 UTC UGD431 BOM → NUU
Mumbai → Nakuru
5X-NIL AIRBUS A-330-800 Incomplete (signal lost) 4560 km
2026-08-20 03:22 UTC UGD431 BOM → NUU
Mumbai → Nakuru
5X-NIL AIRBUS A-330-800 Completed 4665 km
2026-08-15 20:09 UTC UGD431 BOM → NUU
Mumbai → Nakuru
5X-NIL AIRBUS A-330-800 Completed ~11474 km est. (4766 km recorded)
2026-08-12 19:21 UTC UGD431 ? → ? 5X-NIL AIRBUS A-330-800 Incomplete (signal lost) 5229 km

← Back to the live map