YAFT.LIVEYVR · BAE SYSTEMS RJ-100 Avroliner
From the ADS-B positions we received; time since the first fix. A dashed stretch is a gap in reception, bridged by a straight line.
No airline on record.
| Departed | Flight | Route | Reg | Aircraft | Status | Distance |
|---|---|---|---|---|---|---|
| 2026-09-12 15:34 UTC | SUT570 | YVR → ? Vancouver → ? |
C-FURJ | BAE SYSTEMS RJ-100 Avroliner | Incomplete (signal lost) | 617 km |
| 2026-09-09 17:04 UTC | SUT570 | YVR → ? Vancouver → ? |
C-FURJ | BAE SYSTEMS RJ-100 Avroliner | Incomplete (signal lost) | 610 km |
| 2026-09-03 15:26 UTC | SUT570 | YVR → ? Vancouver → ? |
C-FURJ | BAE SYSTEMS RJ-100 Avroliner | Incomplete (signal lost) | 664 km |
| 2026-08-30 15:51 UTC | SUT570 | YVR → ? Vancouver → ? |
C-FURJ | BAE SYSTEMS RJ-100 Avroliner | Completed | 752 km |
| 2026-08-20 19:37 UTC | SUT570 | YVR → YVR Vancouver → Vancouver |
C-FSRJ | BOMBARDIER Dash 8 Q400 | Completed | 1485 km |