YAFT.LIVEACE → TFS · AEROSPATIALE ALENIA ATR72-600 · Binter Canarias
Board data from aena_spain_ace, aena_spain_tfs, updated 6827 min ago; times local to each airport.
From the ADS-B positions we received; time since the first fix. A dashed stretch is a gap in reception, bridged by a straight line.
Binter Canarias (IBB)