YAFT.LIVELEI · Costruzione Aeronautiche Tecnam P2008 · Aerodynamics
From the ADS-B positions we received; time since the first fix. A dashed stretch is a gap in reception, bridged by a straight line.
Aerodynamics (DNC)| Departed | Flight | Route | Reg | Aircraft | Status | Distance |
|---|---|---|---|---|---|---|
| 2026-09-21 15:42 UTC | DNC2YR | LEI → ? Almería → ? |
EC-OME | Costruzione Aeronautiche Tecnam P2008 | Incomplete (signal lost) | 179 km |
| 2026-09-19 15:25 UTC | DNC2YR | ? → ? | HA-JRB | Cessna 172 Skyhawk | Incomplete (signal lost) | 74 km |
| 2026-09-17 11:01 UTC | DNC2YR | ? → ? | EC-OKA | Costruzione Aeronautiche Tecnam P2008 | Incomplete (signal lost) | 72 km |
| 2026-09-14 16:00 UTC | DNC2YR | ? → ? | EC-OMJ | Costruzione Aeronautiche Tecnam P2008 | Incomplete (signal lost) | 78 km |
| 2026-08-28 11:03 UTC | DNC2YR | ? → ? | EC-OJP | Costruzione Aeronautiche Tecnam P2008 | Completed | 62 km |
| 2026-08-26 11:05 UTC | DNC2YR | ? → ? | EC-OMI | Costruzione Aeronautiche Tecnam P2008 | Completed | 156 km |
| 2026-08-19 11:14 UTC | DNC2YR | ? → ? | EC-OMI | Costruzione Aeronautiche Tecnam P2008 | Completed | 59 km |