YAFT.LIVE

APACHE5

GLZ → GLZ

Flight

Status
Completed
Arrival confirmed via
ADS-B (ground reading)
Departure
Gilze Rijen Air Base (GLZ) — Breda, Netherlands
Departed
2026-09-21 11:00 UTC
Arrival
Gilze Rijen Air Base (GLZ) — Breda, Netherlands
Distance flown
105 km
Approach distance
105 km

Aircraft

Registration
Type
H64

Altitude & speed

Max altitude
2,600 ft
Max ground speed
160 kt
Tracked
1h 11m · 104 km
Altitude (ft, max 2,600)
01,4042,8080m30m1h 0m
Ground speed (kt, max 160)
0861730m30m1h 0m
Altitude (ft, max 2,600)
01,4042,8080m1h 0m
Ground speed (kt, max 160)
0861730m1h 0m

From the ADS-B positions we received; time since the first fix. A dashed stretch is a gap in reception, bridged by a straight line.

Route map

Airline

Airpac Airlines, Inc. (APC)

Latest flights

DepartedFlightRouteRegAircraftStatusDistance
2026-10-02 13:12 UTC APACHE5 KRP → KRP
Karup → Karup
Q-38 H64 Completed 25 km
2026-09-22 11:58 UTC APACHE5 GLZ → GLZ
Breda → Breda
Q-43 H64 Completed 35 km
2026-09-21 11:00 UTC APACHE5 GLZ → GLZ
Breda → Breda
Q-45 H64 Completed 105 km
2026-09-19 10:11 UTC APACHE5 GLZ → GLZ
Breda → Breda
Q-43 H64 Completed 243 km
2026-09-18 10:34 UTC APACHE5 GLZ → GLZ
Breda → Breda
Q-49 H64 Completed 314 km
2026-09-16 07:58 UTC APACHE5 GLZ → GLZ
Breda → Breda
Q-49 H64 Completed 48 km
2026-09-10 09:40 UTC APACHE5 GLZ → GLZ
Breda → Breda
Q-46 H64 Completed 15 km
2026-09-09 11:31 UTC APACHE5 GLZ → GLZ
Breda → Breda
Q-49 H64 Completed 52 km
2026-09-07 08:25 UTC APACHE5 GLZ → GLZ
Breda → Breda
Q-47 H64 Completed 133 km
2026-08-28 10:56 UTC APACHE5 GLZ → GLZ
Breda → Breda
Q-44 H64 Completed 31 km
2026-08-25 11:20 UTC APACHE5 GLZ → GLZ
Breda → Breda
Q-44 H64 Completed 189 km
2026-08-24 08:14 UTC APACHE5 GLZ → GLZ
Breda → Breda
Q-45 H64 Completed 371 km
2026-08-20 08:45 UTC APACHE5 WOE → GLZ
Bergen Op Zoom → Breda
Q-40 H64 Completed 562 km
2026-08-19 10:02 UTC APACHE5 WOE → ?
Bergen Op Zoom → ?
Q-40 H64 Incomplete (signal lost) 246 km
2026-08-13 13:44 UTC APACHE5 GLZ → GLZ
Breda → Breda
Q-44 H64 Completed 65 km
2026-08-12 13:02 UTC APACHE5 GLZ → GLZ
Breda → Breda
Q-39 H64 Completed 256 km
2026-08-12 11:37 UTC APACHE5 GLZ → GLZ
Breda → Breda
Q-39 H64 Completed 170 km
2026-08-11 11:49 UTC APACHE5 GLZ → GLZ
Breda → Breda
Q-43 H64 Completed 56 km

← Back to the live map