YAFT.LIVE

N261TD

HCA → TVI · ECLIPSE Eclipse 500

Flight

Status
Completed
Arrival confirmed via
ADS-B (ground reading)
Departure
Big Spring Mc Mahon-Wrinkle Airport (HCA) — Big Spring, United States
Departed
2026-10-01 22:25 UTC
Arrival
Thomasville Regional Airport (TVI) — Thomasville, United States
Distance flown
1693 km
Straight-line distance
1676 km
Approach distance
60 km

Aircraft

Registration
Type
ECLIPSE Eclipse 500

Altitude & speed

Max altitude
41,025 ft
Max ground speed
369 kt
Tracked
2h 55m · 1,689 km
Altitude (ft, max 41,025)
022,15444,3070m30m1h 0m1h 30m2h 0m2h 30m
Ground speed (kt, max 369)
01993990m30m1h 0m1h 30m2h 0m2h 30m
Altitude (ft, max 41,025)
022,15444,3070m1h 0m2h 0m
Ground speed (kt, max 369)
01993990m1h 0m2h 0m

From the ADS-B positions we received; time since the first fix. A dashed stretch is a gap in reception, bridged by a straight line.

Route map

Airlines

No airline on record.

Latest flights

DepartedFlightRouteRegAircraftStatusDistance
2026-10-01 22:25 UTC N261TD HCA → TVI
Big Spring → Thomasville
N261TD ECLIPSE Eclipse 500 Completed 1693 km
2026-10-01 20:03 UTC N261TD PHX → HCA
Phoenix → Big Spring
N261TD ECLIPSE Eclipse 500 Completed (landing presumed) 1051 km
2026-09-30 20:15 UTC N261TD ? → PHX
? → Phoenix
N261TD ECLIPSE Eclipse 500 Completed 214 km
2026-09-30 16:38 UTC N261TD ? → ? N261TD ECLIPSE Eclipse 500 Incomplete (signal lost) 1215 km
2026-09-30 12:07 UTC N261TD TVI → ?
Thomasville → ?
N261TD ECLIPSE Eclipse 500 Completed 1426 km
2026-09-29 00:18 UTC N261TD RMG → TVI
Rome → Thomasville
N261TD ECLIPSE Eclipse 500 Completed (landing presumed) 430 km
2026-09-28 22:18 UTC N261TD TVI → RMG
Thomasville → Rome
N261TD ECLIPSE Eclipse 500 Completed (landing presumed) 416 km
2026-09-28 19:31 UTC N261TD HOU → TVI
Houston → Thomasville
N261TD ECLIPSE Eclipse 500 Completed (landing presumed) 1118 km
2026-09-28 10:55 UTC N261TD TVI → HOU
Thomasville → Houston
N261TD ECLIPSE Eclipse 500 Completed (landing presumed) 1173 km
2026-09-10 20:48 UTC N261TD CHS → TVI
Charleston → Thomasville
N261TD ECLIPSE Eclipse 500 Completed 463 km
2026-09-10 12:31 UTC N261TD TVI → CHS
Thomasville → Charleston
N261TD ECLIPSE Eclipse 500 Completed 462 km
2026-09-08 12:36 UTC N261TD TVI → ?
Thomasville → ?
N261TD ECLIPSE Eclipse 500 Incomplete (signal lost) 339 km
2026-08-31 14:11 UTC N261TD TVI → ?
Thomasville → ?
N261TD ECLIPSE Eclipse 500 Incomplete (signal lost) 720 km

← Back to the live map