YAFT.LIVECostruzioni Aeronautiche Tecnam S.p.A. P2010
From the ADS-B positions we received; time since the first fix. A dashed stretch is a gap in reception, bridged by a straight line.
No airline on record.
| Departed | Flight | Route | Reg | Aircraft | Status | Distance |
|---|---|---|---|---|---|---|
| 2026-09-26 09:08 UTC | ADM565 | ? → ? | CS-ECQ | Costruzioni Aeronautiche Tecnam S.p.A. P2010 | Incomplete (signal lost) | 71 km |
| 2026-09-19 11:21 UTC | ADM565 | ? → ? | CS-ECP | SIRA | Incomplete (signal lost) | 217 km |
| 2026-08-23 07:42 UTC | ADM565 | ? → ? | CS-ECP | SIRA | Incomplete (signal lost) | 285 km |
| 2026-08-15 11:16 UTC | ADM565 | ? → ? | CS-ECO | SIRA | Completed | 111 km |